~openerp-dev/openobject-addons/6.1-opw-576381-bth

Viewing all changes in revision 7014.

  • Committer: Olivier Dony
  • Date: 2012-10-05 10:44:47 UTC
  • mfrom: (7012.1.4 6.1-opw-579232-rgo)
  • Revision ID: odo@openerp.com-20121005104447-3vn0nu9spvdxypqr
[MERGE] OPW 579232: mrp: better handle partial consumption of raw products that were split in production lots

- System will no longer consume every line of raw product after a split
- If a raw product line with the exact quantity to consume is present,
  only this one will be consumed
- If no raw product line matches the quantity to consume, the system
  will consume the available lines (starting with smallest quantities first)
  until it attains the required quantity, possibly splitting one line
  further if no combination of the existing lines gives the right
  quantity.
- The production lot column and the split button will now be available
  on both sides of the production order form, allowing fine control
  of the production lots that were consumed, in case the defaults
  do not match what was used in reality.

expand all expand all

Show diffs side-by-side

added added

removed removed

Lines of Context: