-
Committer:
Chuck Short
-
Date:
2012-11-26 14:06:51 UTC
-
mfrom:
(223.1.2 glance)
-
Revision ID:
zulcss@ubuntu.com-20121126140651-ya41h0wbdwixqcn5
* Re-enable gating of package build based on unit test success:
- d/p/webob_1.1_compat.patch: Misc fixes for changes in behaviour
between webob 1.0.8 and 1.1 which cause test failures.
- d/rules: Enable build failure on unit testing failure, scope
test execution to glance/tests.
* Switched upstart configurations to use start-stop-daemon instead of su.
* General package tidy:
- d/control: Drop glance-client package.
- d/control: Drop BD on python-dev-all.
- Wrapped and sorted.