-
Committer:
jf
-
Date:
2013-10-31 13:55:38 UTC
-
mfrom:
(1789.3.11 UTP_943)
-
mto:
This revision was merged to the branch mainline in
revision
1829.
-
Revision ID:
jfb@tempo-consulting.fr-20131031135538-t385p2t7p7is8p2y
UTP-943 [FIX] Wrong behaviour of the posting date for Analytical corrections entries: posting date is higher than the period... The period doesn't link with the new posting date...
lp:~unifield-team/unifield-wm/UTP_943