~ubuntu-branches/ubuntu/hardy/bzr/hardy-updates

« back to all changes in this revision

Viewing changes to doc/costs.txt

  • Committer: Bazaar Package Importer
  • Author(s): Jeff Bailey
  • Date: 2005-11-07 13:17:53 UTC
  • Revision ID: james.westby@ubuntu.com-20051107131753-qsy145z1rfug5i27
Tags: upstream-0.6.2
ImportĀ upstreamĀ versionĀ 0.6.2

Show diffs side-by-side

added added

removed removed

Lines of Context:
 
1
Costs
 
2
=====
 
3
 
 
4
User thought is most expensive.  User time spent waiting is next.
 
5
Developer time for the version control system is also relatively
 
6
expensive.  
 
7
 
 
8
Machine resources are cheap.  In particular; disk is generally very
 
9
cheap; an ordinary programmer earns enough to buy hundreds of GB of
 
10
disk per day.  However, it is sometimes limited, as on a laptop.
 
11
Therefore it is generally OK to trade off disk space for anything
 
12
else, but it should be possible to be compact.
 
13
 
 
14
Network round trips are very bad.
 
15
 
 
16
Consider scalability also; avoid anything worse than O(n).  Try to
 
17
avoid anything that needs e.g. to hold the whole tree in memory at any
 
18
time, or to hold the entire history of the project.
 
19
 
 
20
 
 
21