~ubuntu-branches/ubuntu/wily/geotranz/wily

  • Committer: Package Import Robot
  • Author(s): Roberto Lumbreras
  • Date: 2014-01-02 02:32:52 UTC
  • mfrom: (1.1.4)
  • Revision ID: package-import@ubuntu.com-20140102023252-5lvwosx5c2r1btuj
Tags: 3.3-1
* New upstream version.
* Updated standards.
* Use default-jre instead of openjdk-6-jre.
* Depend on libjs-jquery and delete jquery.js from source.
* Switch to the shlibs system to end up with the c++ symbol tracking
  nightmare (Closes: #729313).
Filename Latest Rev Last Changed Committer Comment Size
..
.pc 4 13 years ago Bazaar Package Importer * New upstream version. Repackaged upstream 'unix_ Diff
CCS 1.1.1 13 years ago Bazaar Package Importer Import upstream version 3.0 Diff
data 1.1.1 13 years ago Bazaar Package Importer Import upstream version 3.0 Diff
debian 2 15 years ago Bazaar Package Importer Fix makefile to build also the libjnigeotrans.so l Diff
Examples 1.1.1 13 years ago Bazaar Package Importer Import upstream version 3.0 Diff
GEOTRANS3 1.1.1 13 years ago Bazaar Package Importer Import upstream version 3.0 Diff
SpreadsheetTester 1.1.1 13 years ago Bazaar Package Importer Import upstream version 3.0 Diff
Makefile 8 11 years ago Package Import Robot * New upstream version. * Updated standards. * sym 263 bytes Diff Download File